Moss
Landing.

Battery Energy Storage / California

Selected Projects · 02 / 16
01 — The Project

Grid-scale energy storage at the intersection of generation, transmission, and the energy transition.

The Moss Landing Battery Energy Storage System is a major grid-scale storage facility. The technical portfolio identifies a 750 MW / 3,000 MWh program.

Field safety support encompassed construction activities around transformers, switchgear, grounding, control houses and protection equipment.

ProjectMoss Landing BESS
LocationMoss Landing, California
Assignment2022–2023
Field affiliationField safety / electrical construction
03 — Professional Contribution

A contribution within
a larger effort.

  1. 01

    Construction safety

    Supported safety meetings, investigations, and compliance audits during the storage-system expansion.

  2. 02

    Electrical equipment interfaces

    Monitored field safety around transformers, switchgear, grounding, control houses, and protection equipment.

  3. 03

    Field documentation

    Documented findings and corrective follow-up in Intelex.

Works Atlas / Project Perspective

The scale is architectural.
The work is human.

Major infrastructure takes shape through many disciplines, shared responsibilities, and the work of field teams.