← Collection07 — Lower Pool 10 HREP
07 / Civil & MarineUpper Mississippi River, Iowa / Wisconsin · 2026
Lower
Pool 10.
USACE / Habitat Restoration
Selected Projects · 07 / 16
WORKS ATLAS / 07
Lower Pool 10 HREPUpper Mississippi River, Iowa / Wisconsin / 2026
01 — The Project
Habitat restoration where marine construction, water, and heavy equipment converge.
Supported the USACE Lower Pool 10 HREP Stage 1 project along the Upper Mississippi River corridor.
Conducted field safety duties for island reconstruction, shoreline stabilization, riprap placement, floating plant, surveys, crew boats, and work near water.
ProjectLower Pool 10 HREP
LocationUpper Mississippi River, Iowa / Wisconsin
Assignment2026
Field affiliationLegacy Corporation of IL / SSHO
03 — Professional Contribution
A contribution within
a larger effort.
- 01
Marine and shoreline operations
Performed SSHO duties across riprap, island reconstruction, access, and floating-plant activities.
- 02
Crew and vessel safety
Supported PFD compliance, boat operations, emergency preparedness and inspection programs.
- 03
Structured daily reporting
Designed a field reporting workflow for safety, AHA/DFOW status, field conditions and follow-up.
The scale is architectural.
The work is human.
Major infrastructure takes shape through many disciplines, shared responsibilities, and the work of field teams.
Lower Pool 10 HREP / Iowa / Wisconsin